Power that's there when the grid isn't.
Gas and diesel generators and solar systems, designed, installed and serviced by Tricom since 2006.
- Keeping Pakistan powered since
- 2006
- Customers
- 3,000+
- Years as a Generac distributor
- 20+
- Solar EPC contractor since
- 2020
Solar and generator power, engineered for Pakistan's grid
From a single rooftop to a factory floor, one team designs, installs and services it.
What we do
Two divisions, one team responsible from survey to service.

Gas and diesel generators
Authorized Generac distributor for over 20 years
Gas and diesel generators for standby, prime and continuous duty: Generac, plus Tricom generating sets built on Cummins, Perkins and Yangdong engines.
Generac, Cummins, Perkins, Yangdong
See generators
Solar systems
Solar EPC since 2020
On-grid, hybrid and off-grid solar for homes, offices and industry. Rooftop, canopy and ground-mount structures, designed in-house and installed by Tricom engineers.
LONGi, Jinko, JA Solar, Huawei, Solis, Sungrow, CATL
See solar systems
Licensed, certified and authorized
More than 3,000+ homes, businesses and institutions rely on equipment we supplied and maintain. These are the registrations behind that work.
- Established
- 2006, Karachi
- Generac
- Authorized distributor, 20+ years
- PEC
- Licence No. 4058, Category C2
- AEDB
- Certificate CR/26/132/C-1/RN-1
- Solar EPC
- Since 2020
How a project runs
The same five steps whether it is one house or a factory floor.
Site survey and load study
We visit, list what has to stay on, and read your bills and backup history.
Design
Our engineers size the system, draw the layout and send a written proposal.
Supply and installation
Equipment from authorized channels, installed and commissioned by our engineers.
Testing and commissioning
We test under load, hand over drawings and show your staff how it works.
Service
Preventive maintenance, genuine spare parts and a team that answers the phone.
Recent work
Solar for factories and universities, and generators for some of Pakistan's largest organizations.

Elevated structure with walkway
Medicam Group of Companies
PECHS, Karachi

Ground-mount P1 structure
Lasbela University (LUAWMS)
Uthal, Balochistan

Saw-tooth elevated structure
Tex World
Korangi Industrial Area, Karachi
- Pakistan State Oil (PSO)306 generator units supplied across Pakistan.
- Indus HospitalMore than 70 units supplied to hospitals across Pakistan.
- Sui Southern Gas CompanyGas generators: 1 × 275 kVA and 2 × 200 kVA.
- NADRAMultiple generator units supplied.
Clients who rely on us
Over 3,000 residential, commercial and industrial customers, in the private and government sectors.
Brands we supply and install
Tell us what you need to keep running
We start with a site visit and a load study, then send a written proposal.
























